ITAC Assessment: AT0082
ITAC logo
ITAC Assessment: AT0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUTOMOTIVE PARTS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 1,200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,540 1,263,482
kWh
LPG $65,364 7,524
MMBtu
Fuel Oil #2 $13,373 2,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $17,889 $30,000 - $17,889
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $587 $1,500 - $587
-
MMBtu
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $111 - - - $211
-
MMBtu
$(-100.0)
04 2.4133: Use most efficient type of electric motors $97 $173 $97
1,465
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $205 - $205
3,224
kWh
- - -
TOTAL RECOMMENDED $18,889 $31,673 $302
4,689
kWh
$18,476
-
MMBtu
$211
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $1,000 $1,673 $302
4,689
kWh
$587
-
MMBtu
$211
-
MMBtu
$(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs