Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SALTED CORN CHIPS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 115
Plant Area
n/a
Annual Production 16,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,569 2,635,991
kWh
Natural Gas $218,461 47,366
MMBtu
Fuel Oil #2 $54,305 16,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7226: Use computer programs to optimize hvac performance $19,865 $4,500 $19,865
386,284
kWh
- -
02 2.2437: Recover waste heat from equipment $1,781 $2,000 - $1,781
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,398 $3,500 - - $1,398
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $699 $2,650 $699
13,482
kWh
- -
TOTAL RECOMMENDED $23,743 $12,650 $20,564
399,766
kWh
$1,781
-
MMBtu
$1,398
-
MMBtu
TOTAL IMPLEMENTED $20,564 $7,150 $20,564
399,766
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs