ITAC Assessment: AT0075
ITAC logo
ITAC Assessment: AT0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product BEDRM & DIN RM FURNITURE
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 184
Plant Area
n/a
Annual Production 12,500
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,865 3,580,891
kWh
Natural Gas $21,699 3,562
MMBtu
Coal $33,451 26,493
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,723

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,616 $2,484 $4,616
79,132
kWh
-
02 2.4133: Use most efficient type of electric motors $1,287 $2,086 $1,287
21,981
kWh
-
03 2.4312: Improve lubrication practices $1,463 - $1,463
25,205
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,625 - $1,625
27,843
kWh
-
05 2.2121: Increase amount of condensate returned $4,440 $400 - $4,440
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $980 $2,337 - $980
-
MMBtu
07 2.2437: Recover waste heat from equipment $11,690 $2,000 - $11,690
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $312 $150 $312
5,275
kWh
-
TOTAL RECOMMENDED $26,413 $9,457 $9,303
159,436
kWh
$17,110
-
MMBtu
TOTAL IMPLEMENTED $14,723 $7,457 $9,303
159,436
kWh
$5,420
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs