ITAC Assessment: AT0072
ITAC logo
ITAC Assessment: AT0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product T-SHIRTS
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area
n/a
Annual Production 58,800,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,816 5,036,929
kWh
Natural Gas $224,863 49,213
MMBtu
Fuel Oil #2 $27,081 6,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,817

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.5194: Redesign process $25,782 $5,000 - $25,782
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,543 $2,238 $4,543
83,529
kWh
-
03 2.4312: Improve lubrication practices $1,091 - $1,091
19,930
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $625 - $625
11,430
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $19,403 $8,000 $19,403
356,975
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $1,023 $5,000 - $1,023
-
MMBtu
07 2.2511: Insulate bare equipment $335 $150 $335
6,155
kWh
-
08 2.2437: Recover waste heat from equipment $950 $3,000 - $950
-
MMBtu
09 2.2511: Insulate bare equipment $432 $50 - $432
-
MMBtu
10 2.2511: Insulate bare equipment $583 $150 - $583
-
MMBtu
TOTAL RECOMMENDED $54,767 $23,588 $25,997
478,019
kWh
$28,770
-
MMBtu
TOTAL IMPLEMENTED $53,817 $20,588 $25,997
478,019
kWh
$27,820
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs