ITAC Assessment: AT0071
ITAC logo
ITAC Assessment: AT0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product LADIES SPORTSWEAR
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 550,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,585 441,970
kWh
Fuel Oil #2 $18,349 3,178
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,371 $4,570 $2,371
33,118
kWh
-
02 2.2153: Close off unneeded steam lines $162 $50 - $162
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $377 $500 $377
5,275
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $168 - $168
2,345
kWh
-
05 2.4133: Use most efficient type of electric motors $42 $46 $42
586
kWh
-
06 2.3191: Use demand controller or load shedder $423 $2,000 $423
-
kWh
-
TOTAL RECOMMENDED $3,543 $7,166 $3,381
41,324
kWh
$162
-
MMBtu
TOTAL IMPLEMENTED $3,543 $7,166 $3,381
41,324
kWh
$162
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs