ITAC Assessment: AT0045
ITAC logo
ITAC Assessment: AT0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL HEAT TREATING
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 4,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,120 4,073,271
kWh
Natural Gas $212,248 36,285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,281 $4,444 $2,281
47,479
kWh
-
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $12,817 $2,000 - $12,817
-
MMBtu
03 2.2511: Insulate bare equipment $2,194 $100 - $2,194
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $78,041 $50,000 $161,872
3,359,906
kWh
$(-83,831.0)
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $11,209 $5,000 - $11,209
-
MMBtu
06 2.7229: Air condition only space necessary $724 $2,000 $724
14,654
kWh
-
TOTAL RECOMMENDED $107,266 $63,544 $164,877
3,422,039
kWh
$(-57,611.0)
-
MMBtu
TOTAL IMPLEMENTED $94,449 $61,544 $164,877
3,422,039
kWh
$(-70,428.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs