Assessment Year | 1986 |
---|---|
Principal Product | METAL HEAT TREATING |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $201,120 | 4,073,271 |
kWh
|
$0.049 |
Natural Gas | $212,248 | 36,285 |
MMBtu
|
$5.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,266 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,449 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,281 | $4,444 |
$2,281
47,479
kWh
|
- | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $12,817 | $2,000 | - |
$12,817
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $2,194 | $100 | - |
$2,194
-
MMBtu
|
|
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $78,041 | $50,000 |
$161,872
3,359,906
kWh
|
$(-83,831.0)
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $11,209 | $5,000 | - |
$11,209
-
MMBtu
|
|
06 | 2.7229: Air condition only space necessary | $724 | $2,000 |
$724
14,654
kWh
|
- | |
TOTAL RECOMMENDED | $107,266 | $63,544 |
$164,877
3,422,039
kWh
|
$(-57,611.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $94,449 | $61,544 |
$164,877
3,422,039
kWh
|
$(-70,428.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs