| Assessment Year | 1986 |
|---|---|
| Principal Product | FIBER OPTICS |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 340 |
| Plant Area |
n/a
|
| Annual Production | 52,500
thousand feet
|
| Production Hrs. Annual | 8,658
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $562,799 | 12,384,818 |
kWh
|
$0.045 |
| Natural Gas | $147,747 | 26,397 |
MMBtu
|
$5.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,210 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $4,139 | $3,000 | - |
$4,139
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,956 | $300 | - |
$2,956
-
MMBtu
|
|
| 03 | 2.2612: Use cooling tower water instead of refrigeration | $1,314 | $2,000 |
$1,314
29,015
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,618 | $250 |
$1,618
84,701
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,115 | $1,800 |
$1,115
24,619
kWh
|
- | |
| TOTAL RECOMMENDED | $11,142 | $7,350 |
$4,047
138,335
kWh
|
$7,095
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,210 | $5,100 |
$1,115
24,619
kWh
|
$7,095
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs