ITAC Assessment: AT0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,119 5,609,613
kWh
Natural Gas $18,901 3,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,491 $971 $2,491
53,048
kWh
-
02 2.2511: Insulate bare equipment $399 $200 $399
8,499
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,093 $57 $1,093
23,154
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,638 $30,000 $53,797
1,133,939
kWh
$(-29,159.0)
-
MMBtu
TOTAL RECOMMENDED $28,621 $31,228 $57,780
1,218,640
kWh
$(-29,159.0)
-
MMBtu
TOTAL IMPLEMENTED $1,093 $57 $1,093
23,154
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs