ITAC Assessment: AT0039
ITAC logo
ITAC Assessment: AT0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ALUMINUM PIPES (EXTRUDED)
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 54,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,643 7,740,915
kWh
Natural Gas $233,494 40,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $834 $859 $834
17,878
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $2,360 $1,700 $2,360
52,169
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $948 $2,250 $948
20,809
kWh
-
04 2.2511: Insulate bare equipment $9,830 $1,640 - $9,830
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,108 $14,000 $23,490
518,464
kWh
$(-12,382.0)
-
MMBtu
06 2.2532: Use only amount of air necessary to prevent explosion hazard $46,699 $227 $5,300
116,940
kWh
$41,399
-
MMBtu
TOTAL RECOMMENDED $71,779 $20,676 $32,932
726,260
kWh
$38,847
-
MMBtu
TOTAL IMPLEMENTED $69,419 $18,976 $30,572
674,091
kWh
$38,847
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs