Assessment Year | 1986 |
---|---|
Principal Product | ALUMINUM PIPES (EXTRUDED) |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 54,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $350,643 | 7,740,915 |
kWh
|
$0.045 |
Natural Gas | $233,494 | 40,210 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,779 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $69,419 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $834 | $859 |
$834
17,878
kWh
|
- | |
02 | 2.7226: Use computer programs to optimize hvac performance | $2,360 | $1,700 |
$2,360
52,169
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $948 | $2,250 |
$948
20,809
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $9,830 | $1,640 | - |
$9,830
-
MMBtu
|
|
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,108 | $14,000 |
$23,490
518,464
kWh
|
$(-12,382.0)
-
MMBtu
|
|
06 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $46,699 | $227 |
$5,300
116,940
kWh
|
$41,399
-
MMBtu
|
|
TOTAL RECOMMENDED | $71,779 | $20,676 |
$32,932
726,260
kWh
|
$38,847
-
MMBtu
|
||
TOTAL IMPLEMENTED | $69,419 | $18,976 |
$30,572
674,091
kWh
|
$38,847
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs