ITAC Assessment: AS0620
ITAC logo
ITAC Assessment: AS0620
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Coal
NAICS 212111: Bituminous Coal and Lignite Surface Mining
SIC 1221: Bituminous Coal and Lignite Surface Mining
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 698,267,000
ft2
Annual Production 1,500,000
ton
Production Hrs. Annual 4,320
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $873,160 11,701,200
kWh
Electricity Demand $795,814 96,000
kW-mo/yr
Electricity Fees $215,285 -
Natural Gas $23,660 5,620
MMBtu
Other Gas $1,973 1
MMBtu
TOTAL YEARLY COSTS $1,909,892
RECOMMENDED SAVINGS* $475,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $398,173 $3,607,296 $398,173
5,337,436
kWh
-
02 2.8114: Change rate schedules or other changes in utility service $59,900 $797 - $59,900
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,513 $13,160 $7,513
100,710
kWh
-
04 2.7132: Install timers on light switches in little used areas $4,440 $1,980 $4,440
59,503
kWh
-
05 2.7144: Install spectral reflectors / delamp $1,353 $4,202 $755
10,140
kWh
$598
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,214 $2,092 - $1,214
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,006 $268 $1,006
13,491
kWh
-
08 2.7135: Install occupancy sensors $982 $4,140 $982
13,127
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $807 $2,534 $807
10,813
kWh
-
10 2.7224: Reduce space conditioning during non-working hours $278 $93 $278
3,720
kWh
-
TOTAL RECOMMENDED $475,666 $3,636,562 $413,954
5,548,940
kWh
$61,712
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs