ITAC Assessment: AS0601
ITAC logo
ITAC Assessment: AS0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product beer and ale
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 18
Plant Area 22,790
ft2
Annual Production 312,000
units
Production Hrs. Annual 2,424
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,505 495,004
kWh
Electricity Demand $17,009 1,328
kW-mo/yr
Electricity Fees $4,830 -
Natural Gas $23,496 3,250
MMBtu
Other Energy $3,092 1
MMBtu
TOTAL YEARLY COSTS $101,932
RECOMMENDED SAVINGS* $234,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $130,000 $66,000 - - - - - $130,000 -
02 3.5311: Recover and reuse waste material $76,561 $120,000 - - - $14,000 - - $62,561
03 2.9114: Use solar heat to make electricty $21,962 $176,288 $19,481
180,217
kWh
$2,481
-
kW-mo/yr
- - - - -
04 2.7226: Use computer programs to optimize hvac performance $4,347 $618 $1,535
14,196
kWh
$2,812
-
kW-mo/yr
- - - - -
05 2.2511: Insulate bare equipment $852 $3,546 - - $852
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $942 $227
2,098
kWh
$133
-
kW-mo/yr
- - $56 - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $105 $180 $72
668
kWh
$33
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $234,243 $367,574 $21,315
197,179
kWh
$5,459
-
kW-mo/yr
$852
-
MMBtu
$14,000 $56 $130,000 $62,561
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs