ITAC Assessment: AS0590
ITAC logo
ITAC Assessment: AS0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product dried and dehydrated food
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range less than $500
k
# of Employees 9
Plant Area 96,643
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,048
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,174 374,657
kWh
Electricity Demand $2,560 180
kW-mo/yr
Electricity Fees $7,106 -
Natural Gas $46,006 2,993
MMBtu
Other Gas $4,929 1
MMBtu
TOTAL YEARLY COSTS $101,775
RECOMMENDED SAVINGS* $55,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings By-product Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $33,333 $1,245 - - - - $33,333
02 2.9114: Use solar heat to make electricty $17,979 $93,198 $16,573
150,661
kWh
$1,406
-
kW-mo/yr
- - -
03 4.821: Pay bills on time to avoid late fees $3,038 $39 - - $3,038 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,358 $1,128 $809
7,352
kWh
$491
-
kW-mo/yr
- $58 -
05 2.7423: Reduce heat gain by window tinting $196 $299 $119
1,085
kWh
$77
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $55,904 $95,909 $17,501
159,098
kWh
$1,974
-
kW-mo/yr
$3,038 $58 $33,333
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs