Assessment Year | 2024 |
---|---|
Principal Product | Dietary Supplements |
NAICS | 325411: Medicinal and Botanical Manufacturing |
SIC | 2833: Medicinal Chemicals and Botanical Products |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
55,000
ft2
|
Annual Production | 800,000,000
units
|
Production Hrs. Annual | 4,286
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $80,152 | 865,200 |
kWh
|
$0.093 | |
Electricity Demand | $16,029 | 3,206 |
kW-mo/yr
|
$5.00 | |
Electricity Fees | $4,110 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $2,609 | 1,083 |
Tgal
|
$2.41 | |
TOTAL YEARLY COSTS | $102,900 | ||||
RECOMMENDED SAVINGS* | $33,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $33,263 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $29,582 | $284,735 |
$29,387
317,350
kWh
|
$195
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $1,673 | $3,459 |
$1,458
15,732
kWh
|
$215
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,411 | $463 |
$1,234
13,322
kWh
|
$177
-
kW-mo/yr
|
|
04 | 2.4322: Use or replace with energy efficient substitutes | $404 | $496 |
$379
4,088
kWh
|
$25
-
kW-mo/yr
|
|
05 | 2.7423: Reduce heat gain by window tinting | $193 | $667 |
$179
1,928
kWh
|
$14
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $180 | $44 |
$160
1,732
kWh
|
$20
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $33,443 | $289,864 |
$32,797
354,152
kWh
|
$646
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $33,263 | $289,820 |
$32,637
352,420
kWh
|
$626
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs