ITAC Assessment: AS0563
ITAC logo
ITAC Assessment: AS0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hospitality services
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 625,289
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,451 3,929,176
kWh
Electricity Demand $123,079 7,534
kW-mo/yr
Electricity Fees $94,082 -
Natural Gas $241,262 62,995
MMBtu
TOTAL YEARLY COSTS $634,874
RECOMMENDED SAVINGS* $62,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,441

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7272: Install heat pipes / raise cooling setpoint $24,380 $2,114 $12,276
273,394
kWh
$12,104
-
kW-mo/yr
- - -
02 2.7226: Use computer programs to optimize hvac performance $20,707 $53,376 $6,175
137,521
kWh
$6,087
-
kW-mo/yr
$8,445
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,261 $14,447 $5,250
116,978
kWh
$2,683
-
kW-mo/yr
- $1,328 -
04 2.1133: Adjust burners for efficient operation $4,800 $481 - - $4,930
-
MMBtu
- $(-130.0)
05 2.7135: Install occupancy sensors $3,177 $4,584 $2,118
47,238
kWh
$1,059
-
kW-mo/yr
- - -
06 2.7144: Install spectral reflectors / delamp $651 $106 $404
9,004
kWh
$201
-
kW-mo/yr
- $46 -
TOTAL RECOMMENDED $62,976 $75,108 $26,223
584,135
kWh
$22,134
-
kW-mo/yr
$13,375
-
MMBtu
$1,374 $(-130.0)
TOTAL IMPLEMENTED $38,441 $17,042 $17,526
390,372
kWh
$14,787
-
kW-mo/yr
$4,930
-
MMBtu
$1,328 $(-130.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs