ITAC Assessment: AS0562
ITAC logo
ITAC Assessment: AS0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product craft beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 36,000
ft2
Annual Production 9,400
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,778 436,196
kWh
Electricity Fees $21,182 -
Natural Gas $26,149 1,990
MMBtu
Waste Disposal Costs
Water Usage $33,286 2,406
Tgal
TOTAL YEARLY COSTS $138,395
RECOMMENDED SAVINGS* $26,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $20,350 $500 - $4,070 - - $16,280
02 2.8114: Change rate schedules or other changes in utility service $4,196 $37 - $4,196 - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,428 $1,545 $1,334
10,263
kWh
- - $94 -
04 2.1233: Analyze flue gas for proper air/fuel ratio $671 $495 - - $893
-
MMBtu
- $(-222.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $301 $56 $301
2,318
kWh
- - - -
TOTAL RECOMMENDED $26,946 $2,633 $1,635
12,581
kWh
$8,266 $893
-
MMBtu
$94 $16,058
TOTAL IMPLEMENTED $26,275 $2,138 $1,635
12,581
kWh
$8,266 - $94 $16,280
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs