Assessment Year | 2023 |
---|---|
Principal Product | Hospitality services |
NAICS | 721110: Hotels (except Casino Hotels) and Motels |
SIC | 7011: Hotels and Motels |
Sales Range | $500 k to 1M |
# of Employees | 5 |
Plant Area |
11,870
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 4,745
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $7,959 | 113,695 |
kWh
|
$0.070 | |
Electricity Demand | $3,497 | 426 |
kW-mo/yr
|
$8.21 | |
Electricity Fees | $8,232 | - |
|
- | |
Natural Gas | $3,878 | 378 |
MMBtu
|
$10.26 | |
Waste Disposal Costs | |||||
Water Usage | $12,289 | 717 |
Tgal
|
$17.15 | |
TOTAL YEARLY COSTS | $35,855 | ||||
RECOMMENDED SAVINGS* | $6,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,601 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4156: Use flow control valves on equipment to optimize water use | $2,434 | $2,202 | - | - |
$677
-
MMBtu
|
$1,757
-
Tgal
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $1,528 | $7,174 |
$1,316
18,802
kWh
|
$212
-
kW-mo/yr
|
- | - | - | |
03 | 4.611: Begin a practice of predictive / preventative maintenance | $1,477 | $3,284 |
$1,477
21,100
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $784 | $3,277 |
$244
3,488
kWh
|
$245
-
kW-mo/yr
|
- | - | $295 | |
05 | 2.7134: Use photocell controls | $378 | $819 |
$307
4,380
kWh
|
$71
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $6,601 | $16,756 |
$3,344
47,770
kWh
|
$528
-
kW-mo/yr
|
$677
-
MMBtu
|
$1,757
-
Tgal
|
$295 | ||
TOTAL IMPLEMENTED | $6,601 | $16,756 |
$3,344
47,770
kWh
|
$528
-
kW-mo/yr
|
$677
-
MMBtu
|
$1,757
-
Tgal
|
$295 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs