Assessment Year | 2023 |
---|---|
Principal Product | creamers, bulk yogurt, soft serve mixes and frozen yogurt mixes |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
100,000
ft2
|
Annual Production | 21,000
units
|
Production Hrs. Annual | 6,096
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $128,898 | 1,714,800 |
kWh
|
$0.075 | |
Electricity Demand | $22,805 | 3,699 |
kW-mo/yr
|
$6.17 | |
Electricity Fees | $14,171 | - |
|
- | |
Natural Gas | $107,988 | 11,314 |
MMBtu
|
$9.54 | |
Waste Disposal Costs | |||||
Water Usage | $214,575 | 10,638 |
Tgal
|
$20.17 | |
TOTAL YEARLY COSTS | $488,437 | ||||
RECOMMENDED SAVINGS* | $65,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $38,944 | $3,750 |
$35,088
467,835
kWh
|
$3,856
-
kW-mo/yr
|
- | - | - | |
02 | 2.1133: Adjust burners for efficient operation | $20,631 | $410 | - | - |
$22,013
-
MMBtu
|
- | $(-1,382.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,089 | $2,817 |
$2,505
33,405
kWh
|
$435
-
kW-mo/yr
|
- | $149 | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,601 | $1,271 |
$2,361
31,477
kWh
|
$240
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $403 | $840 |
$383
5,102
kWh
|
$20
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $65,668 | $9,088 |
$40,337
537,819
kWh
|
$4,551
-
kW-mo/yr
|
$22,013
-
MMBtu
|
$149 | $(-1,382.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs