ITAC Assessment: AS0547
ITAC logo
ITAC Assessment: AS0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product creamers, bulk yogurt, soft serve mixes and frozen yogurt mixes
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 100,000
ft2
Annual Production 21,000
units
Production Hrs. Annual 6,096
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,898 1,714,800
kWh
Electricity Demand $22,805 3,699
kW-mo/yr
Electricity Fees $14,171 -
Natural Gas $107,988 11,314
MMBtu
Waste Disposal Costs
Water Usage $214,575 10,638
Tgal
TOTAL YEARLY COSTS $488,437
RECOMMENDED SAVINGS* $65,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,944 $3,750 $35,088
467,835
kWh
$3,856
-
kW-mo/yr
- - -
02 2.1133: Adjust burners for efficient operation $20,631 $410 - - $22,013
-
MMBtu
- $(-1,382.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,089 $2,817 $2,505
33,405
kWh
$435
-
kW-mo/yr
- $149 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,601 $1,271 $2,361
31,477
kWh
$240
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $403 $840 $383
5,102
kWh
$20
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $65,668 $9,088 $40,337
537,819
kWh
$4,551
-
kW-mo/yr
$22,013
-
MMBtu
$149 $(-1,382.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs