ITAC Assessment: AS0541
ITAC logo
ITAC Assessment: AS0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product truck bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 341
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,342 5,262,486
kWh
Electricity Demand $153,159 11,796
kW-mo/yr
Electricity Fees $41,101 -
LPG $37,384 1,724
MMBtu
TOTAL YEARLY COSTS $550,986
RECOMMENDED SAVINGS* $121,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $116,802 $60,350 $85,353
1,399,236
kWh
$31,449
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,906 $8,806 $2,637
43,233
kWh
$1,091
-
kW-mo/yr
$178
03 2.6211: Conserve energy by efficient use of vending machines $357 $826 $240
3,942
kWh
$117
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $253 $1,056 $110
1,805
kWh
$143
-
kW-mo/yr
-
05 2.7132: Install timers on light switches in little used areas $484 $840 $484
7,932
kWh
- -
TOTAL RECOMMENDED $121,802 $71,878 $88,824
1,456,148
kWh
$32,800
-
kW-mo/yr
$178
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs