Assessment Year | 2023 |
---|---|
Principal Product | 200mm silicon wafers |
NAICS | 334413: Semiconductor and Related Device Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $100 M to 500M |
# of Employees | 390 |
Plant Area |
1,500,000
ft2
|
Annual Production | 2,940,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,319,821 | 74,452,000 |
kWh
|
$0.031 | |
Electricity Demand | $1,752,987 | 220,310 |
kW-mo/yr
|
$7.96 | |
Electricity Fees | $1,398,044 | - |
|
- | |
Natural Gas | $437,752 | 58,686 |
MMBtu
|
$7.46 | |
Waste Disposal Costs | |||||
Water Usage | $1,549,471 | 292,778 |
Tgal
|
$5.29 | |
TOTAL YEARLY COSTS | $7,458,075 | ||||
RECOMMENDED SAVINGS* | $1,288,923 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $722,230 | $2,223,000 |
$579,237
18,565,298
kWh
|
$142,993
-
kW-mo/yr
|
- | - | |
02 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $290,625 | $126,000 | - | - |
$290,625
-
MMBtu
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $170,279 | $17,076 |
$81,302
2,605,820
kWh
|
$88,977
-
kW-mo/yr
|
- | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $99,703 | $442,407 |
$47,605
1,525,803
kWh
|
$52,098
-
kW-mo/yr
|
- | - | |
05 | 2.7134: Use photocell controls | $3,648 | $8,619 |
$2,733
87,600
kWh
|
$915
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,438 | $3,603 |
$1,627
52,114
kWh
|
$454
-
kW-mo/yr
|
- | $357 | |
TOTAL RECOMMENDED | $1,288,923 | $2,820,705 |
$712,504
22,836,635
kWh
|
$285,437
-
kW-mo/yr
|
$290,625
-
MMBtu
|
$357 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs