ITAC Assessment: AS0534
ITAC logo
ITAC Assessment: AS0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product baked buns and bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 135,000
ft2
Annual Production 115,000,000
lb
Production Hrs. Annual 8,712
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,783 7,403,412
kWh
Electricity Demand $90,353 17,240
kW-mo/yr
Electricity Fees $22,058 -
Natural Gas $274,969 62,294
MMBtu
Waste Disposal Costs
Water Usage $70,706 10,636
Tgal
TOTAL YEARLY COSTS $927,869
RECOMMENDED SAVINGS* $25,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 3.5316: Contract a wood pallet recycling company $20,000 $450 - - - $20,000
-
lb
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,218 $1,951 $2,919
46,326
kWh
$299
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,431 $4,511 $1,190
18,884
kWh
$241
-
kW-mo/yr
- - -
04 2.1133: Adjust burners for efficient operation $255 $410 - - $706
-
MMBtu
- $(-451.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $318 $980 $287
4,561
kWh
$31
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $25,222 $8,302 $4,396
69,771
kWh
$571
-
kW-mo/yr
$706
-
MMBtu
$20,000
-
lb
$(-451.0)
TOTAL IMPLEMENTED $23,218 $2,401 $2,919
46,326
kWh
$299
-
kW-mo/yr
- $20,000
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs