ITAC Assessment: AS0530
ITAC logo
ITAC Assessment: AS0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Elementary and Secondary Schools
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 52
Plant Area 24,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,868
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,433 260,880
kWh
Electricity Demand $7,805 1,293
kW-mo/yr
Electricity Fees $8,608 -
Waste Disposal Costs
Water Usage $11,784 2,443
Tgal
TOTAL YEARLY COSTS $49,630
RECOMMENDED SAVINGS* $8,438 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,485 $5,516 $3,356
40,830
kWh
$345
-
kW-mo/yr
- $784
02 2.7144: Install spectral reflectors / delamp $1,689 $1,993 $1,389
16,895
kWh
$133
-
kW-mo/yr
- $167
03 2.7135: Install occupancy sensors $1,562 $1,942 $1,562
18,999
kWh
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $305 $6,317 $248
3,012
kWh
$57
-
kW-mo/yr
- -
05 2.7423: Reduce heat gain by window tinting $239 $1,183 $170
2,067
kWh
$69
-
kW-mo/yr
- -
06 3.4154: Eliminate leaks in water lines and valves $158 $86 - - $158
-
Tgal
-
TOTAL RECOMMENDED $8,438 $17,037 $6,725
81,803
kWh
$604
-
kW-mo/yr
$158
-
Tgal
$951
TOTAL IMPLEMENTED $8,133 $10,720 $6,477
78,791
kWh
$547
-
kW-mo/yr
$158
-
Tgal
$951
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs