Assessment Year | 2006 |
---|---|
Principal Product | Semiconductors |
NAICS | 334413: Semiconductor and Related Device Manufacturing |
SIC | 3674: Semiconductors and Related Devices |
Sales Range | greater than $500 M |
# of Employees | 1,500 |
Plant Area |
1,000,000
ft2
|
Annual Production | 438,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $8,631,919 | 164,686,000 |
kWh
|
$0.052 |
Electricity Demand | $716,290 | 245,545 |
kW-mo/yr
|
$2.92 |
Electricity Fees | $217,715 | - |
|
- |
Natural Gas | $1,077,636 | 132,106 |
MMBtu
|
$8.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $233,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $204,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $189,400 | $50,000 | - | - |
$89,400
-
MMBtu
|
$100,000
-
gal
|
- | |
02 | 2.4314: Use synthetic lubricant | $27,782 | - |
$25,818
320,725
kWh
|
$1,964
-
kW-mo/yr
|
- | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,900 | $500 | - | - |
$9,900
-
MMBtu
|
- | - | |
04 | 2.7135: Install occupancy sensors | $2,520 | $790 |
$2,470
31,680
kWh
|
$50
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,305 | $1,450 |
$335
4,160
kWh
|
$25
-
kW-mo/yr
|
- | - | $1,945 | |
06 | 2.2511: Insulate bare equipment | $1,520 | $100 | - | - |
$1,520
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $233,427 | $52,840 |
$28,623
356,565
kWh
|
$2,039
-
kW-mo/yr
|
$100,820
-
MMBtu
|
$100,000
-
gal
|
$1,945 | ||
TOTAL IMPLEMENTED | $204,125 | $52,740 |
$2,805
35,840
kWh
|
$75
-
kW-mo/yr
|
$99,300
-
MMBtu
|
$100,000
-
gal
|
$1,945 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs