ITAC Assessment: AS0521
ITAC logo
ITAC Assessment: AS0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread, Cake - not forzen
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 80,000
ft2
Annual Production 5,600,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,245 3,293,840
kWh
Electricity Demand $31,864 6,319
kW-mo/yr
Electricity Fees $5,466 -
Natural Gas $392,798 43,035
MMBtu
TOTAL YEARLY COSTS $667,373
RECOMMENDED SAVINGS* $82,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,561

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 3.5316: Contract a wood pallet recycling company $52,178 $1,517 - - $52,178
-
lb
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,344 $6,500 $25,999
361,100
kWh
$2,345
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $755 $5,520 $689
9,567
kWh
$66
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $835 $814 $763
10,599
kWh
$72
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $191 $514 $177
2,459
kWh
$14
-
kW-mo/yr
-
06 2.2515: Use optimum thickness insulation $13 $109 $13
177
kWh
- -
TOTAL RECOMMENDED $82,316 $14,974 $27,641
383,902
kWh
$2,497
-
kW-mo/yr
$52,178
-
lb
TOTAL IMPLEMENTED $81,561 $9,454 $26,952
374,335
kWh
$2,431
-
kW-mo/yr
$52,178
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs