Assessment Year | 2022 |
---|---|
Principal Product | Bread, Cake - not forzen |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
80,000
ft2
|
Annual Production | 5,600,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,245 | 3,293,840 |
kWh
|
$0.072 |
Electricity Demand | $31,864 | 6,319 |
kW-mo/yr
|
$5.04 |
Electricity Fees | $5,466 | - |
|
- |
Natural Gas | $392,798 | 43,035 |
MMBtu
|
$9.13 |
TOTAL YEARLY COSTS | $667,373 | |||
RECOMMENDED SAVINGS* | $82,316 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,561 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.5316: Contract a wood pallet recycling company | $52,178 | $1,517 | - | - |
$52,178
-
lb
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,344 | $6,500 |
$25,999
361,100
kWh
|
$2,345
-
kW-mo/yr
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $755 | $5,520 |
$689
9,567
kWh
|
$66
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $835 | $814 |
$763
10,599
kWh
|
$72
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $191 | $514 |
$177
2,459
kWh
|
$14
-
kW-mo/yr
|
- | |
06 | 2.2515: Use optimum thickness insulation | $13 | $109 |
$13
177
kWh
|
- | - | |
TOTAL RECOMMENDED | $82,316 | $14,974 |
$27,641
383,902
kWh
|
$2,497
-
kW-mo/yr
|
$52,178
-
lb
|
||
TOTAL IMPLEMENTED | $81,561 | $9,454 |
$26,952
374,335
kWh
|
$2,431
-
kW-mo/yr
|
$52,178
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs