Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 100
Plant Area 3,654,000
ft2
Annual Production 11,680,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,204,855 35,179,886
kWh
Electricity Demand $1,333,802 60,073
kW-mo/yr
Electricity Fees $463,125 -
Natural Gas $186,680 29,673
MMBtu
TOTAL YEARLY COSTS $3,188,462
RECOMMENDED SAVINGS* $3,495,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,469,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings By-product Production Savings
01 3.5311: Recover and reuse waste material $3,163,484 $699,500 - - $(-108,376.0) - $1,320,570 $1,951,290
02 2.4113: Install motor voltage controller on lightly loaded motors $296,800 $1,447,700 $84,940
2,483,626
kWh
$211,860
-
kW-mo/yr
- - - -
03 3.1191: Change procedures / equipment / operating conditions $25,969 $50,414 $7,432
217,296
kWh
$18,537
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,685 $19,485 $4,153
121,407
kWh
$5,555
-
kW-mo/yr
- $(-23.0) - -
TOTAL RECOMMENDED $3,495,938 $2,217,099 $96,525
2,822,329
kWh
$235,952
-
kW-mo/yr
$(-108,376.0) $(-23.0) $1,320,570 $1,951,290
TOTAL IMPLEMENTED $3,469,969 $2,166,685 $89,093
2,605,033
kWh
$217,415
-
kW-mo/yr
$(-108,376.0) $(-23.0) $1,320,570 $1,951,290
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs