ITAC Assessment: AS0493
ITAC logo
ITAC Assessment: AS0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 13
Plant Area 40,000
ft2
Annual Production 654,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,689 2,787,087
kWh
Electricity Demand $63,432 6,170
kW-mo/yr
Electricity Fees $23,511 -
TOTAL YEARLY COSTS $283,632
RECOMMENDED SAVINGS* $47,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.8112: Combine utility meters $21,443 $1,473 $62,685
-
kWh
$(-42,007.0)
-
kW-mo/yr
$765
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,179 $8,066 $10,687
150,514
kWh
$2,492
-
kW-mo/yr
-
03 2.4323: Use optimum size and capacity equipment $9,788 $3,941 $8,452
119,048
kWh
$1,336
-
kW-mo/yr
-
04 2.6125: Keep equipment clean $1,693 $2,174 $1,693
23,848
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,045 $2,451 $894
12,589
kWh
$172
-
kW-mo/yr
$(-21.0)
TOTAL RECOMMENDED $47,148 $18,105 $84,411
305,999
kWh
$(-38,007.0)
-
kW-mo/yr
$744
TOTAL IMPLEMENTED $47,148 $18,105 $84,411
305,999
kWh
$(-38,007.0)
-
kW-mo/yr
$744
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs