Assessment Year | 2020 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 11 |
Plant Area |
30,000
ft2
|
Annual Production | 2,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $632,133 | 9,156,662 |
kWh
|
$0.069 |
Electricity Demand | $83,560 | 15,989 |
kW-mo/yr
|
$5.23 |
Electricity Fees | $61,539 | - |
|
- |
TOTAL YEARLY COSTS | $777,232 | |||
RECOMMENDED SAVINGS* | $266,363 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $180,477 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $176,974 | $3,941 |
$163,403
2,368,160
kWh
|
$13,571
-
kW-mo/yr
|
- | - | |
02 | 2.8112: Combine utility meters | $69,299 | $735 |
$107,959
-
kWh
|
$(-30,500.0)
-
kW-mo/yr
|
$(-8,160.0) | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,587 | $9,520 |
$15,066
218,353
kWh
|
$1,521
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,757 | $511 |
$1,757
25,458
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,511 | $2,230 |
$1,323
19,167
kWh
|
$136
-
kW-mo/yr
|
- | $52 | |
06 | 2.7272: Install heat pipes / raise cooling setpoint | $235 | $38 |
$180
2,606
kWh
|
$55
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $266,363 | $16,975 |
$289,688
2,633,744
kWh
|
$(-15,217.0)
-
kW-mo/yr
|
$(-8,160.0) | $52 | ||
TOTAL IMPLEMENTED | $180,477 | $6,720 |
$166,663
2,415,391
kWh
|
$13,762
-
kW-mo/yr
|
- | $52 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs