ITAC Assessment: AS0486
ITAC logo
ITAC Assessment: AS0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 68
Plant Area 100,000
ft2
Annual Production 40,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,088,228 79,413,541
kWh
Electricity Demand $739,825 130,700
kW-mo/yr
Electricity Fees $519,696 -
TOTAL YEARLY COSTS $5,347,749
RECOMMENDED SAVINGS* $2,017,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 3.6192: Use a less expensive method of waste removal $1,003,559 $89,800 - - - $1,003,559
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $874,664 $45,574 $760,213
14,761,408
kWh
$114,451
-
kW-mo/yr
- -
03 3.6125: Sell combustible waste $125,510 $39,685 - - $(-45,595.0)
-
MMBtu
$171,105
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,726 $16,955 $7,584
147,258
kWh
$1,142
-
kW-mo/yr
- -
05 3.7198: Reduce / eliminate use of disposable product $3,278 $8,361 $(-31.0)
(-593)
kWh
- - $3,309
06 2.7135: Install occupancy sensors $892 $2,659 $892
17,324
kWh
- - -
07 2.6211: Conserve energy by efficient use of vending machines $568 $693 $489
9,487
kWh
$79
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $381 $132 $331
6,422
kWh
$50
-
kW-mo/yr
- -
TOTAL RECOMMENDED $2,017,578 $203,859 $769,478
14,941,306
kWh
$115,722
-
kW-mo/yr
$(-45,595.0)
-
MMBtu
$1,177,973
TOTAL IMPLEMENTED $10,567 $20,439 $9,296
180,491
kWh
$1,271
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings