Assessment Year | 2020 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 68 |
Plant Area |
100,000
ft2
|
Annual Production | 40,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,088,228 | 79,413,541 |
kWh
|
$0.051 |
Electricity Demand | $739,825 | 130,700 |
kW-mo/yr
|
$5.66 |
Electricity Fees | $519,696 | - |
|
- |
TOTAL YEARLY COSTS | $5,347,749 | |||
RECOMMENDED SAVINGS* | $2,017,578 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,567 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6192: Use a less expensive method of waste removal | $1,003,559 | $89,800 | - | - | - | $1,003,559 | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $874,664 | $45,574 |
$760,213
14,761,408
kWh
|
$114,451
-
kW-mo/yr
|
- | - | |
03 | 3.6125: Sell combustible waste | $125,510 | $39,685 | - | - |
$(-45,595.0)
-
MMBtu
|
$171,105 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,726 | $16,955 |
$7,584
147,258
kWh
|
$1,142
-
kW-mo/yr
|
- | - | |
05 | 3.7198: Reduce / eliminate use of disposable product | $3,278 | $8,361 |
$(-31.0)
(-593)
kWh
|
- | - | $3,309 | |
06 | 2.7135: Install occupancy sensors | $892 | $2,659 |
$892
17,324
kWh
|
- | - | - | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $568 | $693 |
$489
9,487
kWh
|
$79
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $381 | $132 |
$331
6,422
kWh
|
$50
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $2,017,578 | $203,859 |
$769,478
14,941,306
kWh
|
$115,722
-
kW-mo/yr
|
$(-45,595.0)
-
MMBtu
|
$1,177,973 | ||
TOTAL IMPLEMENTED | $10,567 | $20,439 |
$9,296
180,491
kWh
|
$1,271
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs