ITAC Assessment: AS0468
ITAC logo
ITAC Assessment: AS0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 600,000
ft2
Annual Production 11,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,034,530 27,990,500
kWh
Electricity Demand $827,744 45,250
kW-mo/yr
Electricity Fees $529,993 -
TOTAL YEARLY COSTS $2,392,267
RECOMMENDED SAVINGS* $431,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $431,083

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $282,838 $718,201 $167,263
4,520,628
kWh
$115,575
-
kW-mo/yr
-
02 3.5313: Increase amount of waste recovered for resale $133,287 $240,000 - - $133,287
03 2.7229: Air condition only space necessary $12,668 $21,240 $4,574
123,617
kWh
$8,094
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,290 $400 $851
23,009
kWh
$1,439
-
kW-mo/yr
-
TOTAL RECOMMENDED $431,083 $979,841 $172,688
4,667,254
kWh
$125,108
-
kW-mo/yr
$133,287
TOTAL IMPLEMENTED $431,083 $979,841 $172,688
4,667,254
kWh
$125,108
-
kW-mo/yr
$133,287
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs