ITAC Assessment: AS0462
ITAC logo
ITAC Assessment: AS0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product PET Bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,422
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,439 1,124,160
kWh
Electricity Demand $17,636 3,506
kW-mo/yr
Electricity Fees $480 -
TOTAL YEARLY COSTS $112,555
RECOMMENDED SAVINGS* $34,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4311: Recover mechanical energy $20,198 $17,100 $18,166
216,529
kWh
$2,032
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,497 $2,116 $7,620
90,717
kWh
$877
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,798 $450 $3,416
40,667
kWh
$382
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,105 $1,995 $1,909
22,734
kWh
$196
-
kW-mo/yr
TOTAL RECOMMENDED $34,598 $21,661 $31,111
370,647
kWh
$3,487
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs