ITAC Assessment: AS0460
ITAC logo
ITAC Assessment: AS0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Fluid milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 20,000,000
ton
Production Hrs. Annual 2,686
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,438 2,764,531
kWh
Electricity Demand $13,272 5,321
kW-mo/yr
Electricity Fees $27,895 -
Natural Gas $73,286 10,020
MMBtu
TOTAL YEARLY COSTS $271,891
RECOMMENDED SAVINGS* $16,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,274

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $14,076 $47,006 $11,934
209,370
kWh
$2,142
-
kW-mo/yr
-
02 2.2135: Repair and eliminate steam leaks $1,542 $300 - - $1,542
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $542 $1,624 $460
8,028
kWh
$82
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $190 $375 $190
3,346
kWh
- -
TOTAL RECOMMENDED $16,350 $49,305 $12,584
220,744
kWh
$2,224
-
kW-mo/yr
$1,542
-
MMBtu
TOTAL IMPLEMENTED $2,274 $2,299 $650
11,374
kWh
$82
-
kW-mo/yr
$1,542
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs