ITAC Assessment: AS0456
ITAC logo
ITAC Assessment: AS0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Machined Automotive Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 100,000
ft2
Annual Production 39,500,000
pieces
Production Hrs. Annual 7,300
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,381 6,270,225
kWh
Electricity Demand $38,997 13,013
kW-mo/yr
Electricity Fees $157,183 -
Waste Disposal Costs
Water Usage $5,430 308
Tgal
TOTAL YEARLY COSTS $541,991
RECOMMENDED SAVINGS* $221,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,722 $320 $6,163
113,515
kWh
$559
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,727 $13,500 $7,785
143,377
kWh
$942
-
kW-mo/yr
- -
03 2.7226: Use computer programs to optimize hvac performance $46,649 $220,160 $39,226
722,400
kWh
$7,423
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $30,900 $16,614 - - $30,900 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $21,670 $51,257 $19,834
365,263
kWh
$1,836
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $82,206 $176,400 $75,241
1,385,658
kWh
$6,965
-
kW-mo/yr
- -
07 2.8114: Change rate schedules or other changes in utility service $24,546 - - - - $24,546
TOTAL RECOMMENDED $221,420 $478,251 $148,249
2,730,213
kWh
$17,725
-
kW-mo/yr
$30,900 $24,546
TOTAL IMPLEMENTED $88,928 $176,720 $81,404
1,499,173
kWh
$7,524
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs