Assessment Year | 2017 |
---|---|
Principal Product | Screen Printing Machines and Medical Carts |
NAICS | 323113: Commercial Screen Printing |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
83,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $81,024 | 979,200 |
kWh
|
$0.083 | |
Electricity Demand | $19,332 | 3,666 |
kW-mo/yr
|
$5.27 | |
Electricity Fees | $488 | - |
|
- | |
Natural Gas | $12,812 | 1,525 |
MMBtu
|
$8.40 | |
Waste Disposal Costs | |||||
Water Usage | $5,740 | 992 |
Tgal
|
$5.79 | |
TOTAL YEARLY COSTS | $119,396 | ||||
RECOMMENDED SAVINGS* | $16,466 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,777 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2447: Heat water with exhaust heat | $6,252 | $11,340 |
$3,406
41,184
kWh
|
$2,846
-
kW-mo/yr
|
- | |
02 | 2.7229: Air condition only space necessary | $3,949 | - |
$2,887
34,192
kWh
|
$1,062
-
kW-mo/yr
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $2,828 | $11,700 |
$2,768
33,467
kWh
|
$60
-
kW-mo/yr
|
- | |
04 | 4.623: Employ modular jigs to reduce process set-up time | $1,480 | $5,950 | - | - |
$1,480
-
MMBtu
|
|
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,478 | $3,870 |
$846
10,240
kWh
|
$632
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $479 | $56 |
$323
3,669
kWh
|
$156
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $16,466 | $32,916 |
$10,230
122,752
kWh
|
$4,756
-
kW-mo/yr
|
$1,480
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,777 | $11,700 |
$5,655
67,659
kWh
|
$1,122
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs