ITAC Assessment: AS0447
ITAC logo
ITAC Assessment: AS0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Colored polymer pellets
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2816: Inorganic Pigments
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 4,264
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,724 1,497,360
kWh
Electricity Demand $42,397 6,221
kW-mo/yr
Electricity Fees $890 -
Waste Disposal Costs
Water Usage $11,479 2,428
Tgal
Solid Waste (non-haz) $41,000 15,000
lb
TOTAL YEARLY COSTS $271,489
RECOMMENDED SAVINGS* $43,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7145: Install skylights $2,950 $11,772 $2,950
25,207
kWh
- -
02 2.7232: Replace existing hvac unit with high efficiency model $6,627 $26,290 $5,602
47,877
kWh
$1,025
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $827 $80 $729
6,230
kWh
$98
-
kW-mo/yr
-
04 3.6125: Sell combustible waste $32,800 $9 - - $32,800
-
lb
TOTAL RECOMMENDED $43,204 $38,151 $9,281
79,314
kWh
$1,123
-
kW-mo/yr
$32,800
-
lb
TOTAL IMPLEMENTED $827 $80 $729
6,230
kWh
$98
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs