ITAC Assessment: AS0432
ITAC logo
ITAC Assessment: AS0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Avionics, Electronics
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 3,500
Plant Area 1,000,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,216
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $568,844 9,659,268
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $17,236 $15,000 $17,236
287,259
kWh
02 2.9112: Use solar heat to heat water $13,683 $78,400 $13,683
228,056
kWh
03 2.4237: Substitute compressed air cooling with water or air cooling $9,888 $3,000 $9,888
164,811
kWh
04 2.3312: Install efficient rectifiers $540 $15,000 $540
9,000
kWh
TOTAL RECOMMENDED $41,347 $111,400 $41,347
689,126
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs