ITAC Assessment: AS0430
ITAC logo
ITAC Assessment: AS0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Calcium carbonate
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 130,679
ft2
Annual Production 218,000
ton
Production Hrs. Annual 2,530
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $934,227 11,505,600
kWh
Natural Gas $55,260 4,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $147,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $136,800 $2 $136,800
1,800,000
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $9,545 $7,500 $9,545
125,571
kWh
-
03 2.2511: Insulate bare equipment $3 $1,077 - $3
-
MMBtu
04 2.7145: Install skylights $782 $4,400 $782
10,296
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $770 $1,000 - $770
-
MMBtu
TOTAL RECOMMENDED $147,900 $13,979 $147,127
1,935,867
kWh
$773
-
MMBtu
TOTAL IMPLEMENTED $10,330 $12,977 $10,327
135,867
kWh
$3
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs