Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Boric acid, lime, cement and stucco
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 53,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,096
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,408 685,129
kWh
Electricity Demand $2,258 2,522
kW-mo/yr
Natural Gas $15,491 1,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $53,975 $63,819 - - $53,975
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,093 $1,000 $2,973
31,632
kWh
$120
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $2,465 $10,000 $2,369
25,211
kWh
$96
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $2,236 $20,867 $2,149
23,149
kWh
$87
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,551 $2,513 $1,491
15,517
kWh
$60
-
kW-mo/yr
-
06 2.4323: Use optimum size and capacity equipment $933 $8,000 $897
9,544
kWh
$36
-
kW-mo/yr
-
07 2.9112: Use solar heat to heat water $904 $6,400 $869
9,602
kWh
$35
-
kW-mo/yr
-
08 2.9114: Use solar heat to make electricty $576 $22,500 $576
9,000
kWh
- -
TOTAL RECOMMENDED $65,733 $135,099 $11,324
123,655
kWh
$434
-
kW-mo/yr
$53,975
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs