ITAC Assessment: AS0425
ITAC logo
ITAC Assessment: AS0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area 2,306,794
ft2
Annual Production 31,000
Tgal
Production Hrs. Annual 4,318
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,869 3,636,640
kWh
Natural Gas $106,883 12,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $11,573 $500 - $11,573
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,372 $15,000 $4,372
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,670 $1,000 - $2,670
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $382 $99 - $382
-
MMBtu
TOTAL RECOMMENDED $18,997 $16,599 $4,372
-
kW-mo/yr
$14,625
-
MMBtu
TOTAL IMPLEMENTED $16,327 $15,599 $4,372
-
kW-mo/yr
$11,955
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs