ITAC Assessment: AS0414
ITAC logo
ITAC Assessment: AS0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product water treatment
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 13
Plant Area 40,000
ft2
Annual Production 12,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,237 6,117,960
kWh
Electricity Demand $94,059 41,074
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $860,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4131: Size electric motors for peak operating efficiency $813,934 $3,030,000 $813,450
1,137,700
kWh
$484
-
kW-mo/yr
-
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $28,518 $20,000 $28,518
103,054
kWh
- -
03 4.821: Pay bills on time to avoid late fees $17,731 $200 - - $17,731
TOTAL RECOMMENDED $860,183 $3,050,200 $841,968
1,240,754
kWh
$484
-
kW-mo/yr
$17,731
TOTAL IMPLEMENTED $46,249 $20,200 $28,518
103,054
kWh
- $17,731
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs