ITAC Assessment: AS0411
ITAC logo
ITAC Assessment: AS0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Injectable drugs
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 280,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,320
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $932,181 15,062,245
kWh
Natural Gas $205,698 3,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $56,988 $21,600 $46,206
689,644
kWh
$10,782
-
kW-mo/yr
-
02 2.1213: Direct warmest air to combustion intake $18,100 $1,500 - - $18,100
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,306 $1,000 $6,405
95,494
kWh
$901
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $6,515 $10,000 $5,710
85,230
kWh
$805
-
kW-mo/yr
-
05 2.4323: Use optimum size and capacity equipment $5,783 $11,000 $5,068
75,646
kWh
$715
-
kW-mo/yr
-
06 2.2135: Repair and eliminate steam leaks $4,077 $8,000 $3,632
54,210
kWh
$445
-
kW-mo/yr
-
07 2.2136: Install / repair insulation on steam lines $2,150 $991 - - $2,150
-
MMBtu
TOTAL RECOMMENDED $100,919 $54,091 $67,021
1,000,224
kWh
$13,648
-
kW-mo/yr
$20,250
-
MMBtu
TOTAL IMPLEMENTED $11,383 $9,000 $10,037
149,704
kWh
$1,346
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs