Assessment Year | 2005 |
---|---|
Principal Product | Injectable drugs |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
280,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $932,181 | 15,062,245 |
kWh
|
$0.062 |
Natural Gas | $205,698 | 3,489 |
MMBtu
|
$58.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,919 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,383 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $56,988 | $21,600 |
$46,206
689,644
kWh
|
$10,782
-
kW-mo/yr
|
- | |
02 | 2.1213: Direct warmest air to combustion intake | $18,100 | $1,500 | - | - |
$18,100
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,306 | $1,000 |
$6,405
95,494
kWh
|
$901
-
kW-mo/yr
|
- | |
04 | 2.4224: Upgrade controls on compressors | $6,515 | $10,000 |
$5,710
85,230
kWh
|
$805
-
kW-mo/yr
|
- | |
05 | 2.4323: Use optimum size and capacity equipment | $5,783 | $11,000 |
$5,068
75,646
kWh
|
$715
-
kW-mo/yr
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $4,077 | $8,000 |
$3,632
54,210
kWh
|
$445
-
kW-mo/yr
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $2,150 | $991 | - | - |
$2,150
-
MMBtu
|
|
TOTAL RECOMMENDED | $100,919 | $54,091 |
$67,021
1,000,224
kWh
|
$13,648
-
kW-mo/yr
|
$20,250
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,383 | $9,000 |
$10,037
149,704
kWh
|
$1,346
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs