ITAC Assessment: AS0408
ITAC logo
ITAC Assessment: AS0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Semiconductors
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 140,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,896
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $713,977 11,648,173
kWh
Natural Gas $1,119 82
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $516,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $505,076 $214,240 - $505,076
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,937 $38,229 $2,937
41,957
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,472 $1,000 $3,472
49,810
kWh
-
04 2.7232: Replace existing hvac unit with high efficiency model $1,761 $24,575 $1,761
25,985
kWh
-
05 2.4133: Use most efficient type of electric motors $1,575 $14,371 $1,575
22,035
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,267 $3,000 $1,267
18,181
kWh
-
TOTAL RECOMMENDED $516,088 $295,415 $11,012
157,968
kWh
$505,076
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs