| Assessment Year | 2005 |
|---|---|
| Principal Product | Semiconductors |
| NAICS | 334413: Semiconductor and Related Device Manufacturing |
| SIC | 3674: Semiconductors and Related Devices |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
140,000
ft2
|
| Annual Production | 0
pieces
|
| Production Hrs. Annual | 4,896
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $713,977 | 11,648,173 |
kWh
|
$0.061 |
| Natural Gas | $1,119 | 82 |
MMBtu
|
$13.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $516,088 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Primary Product Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $505,076 | $214,240 | - | $505,076 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,937 | $38,229 |
$2,937
41,957
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,472 | $1,000 |
$3,472
49,810
kWh
|
- | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,761 | $24,575 |
$1,761
25,985
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,575 | $14,371 |
$1,575
22,035
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,267 | $3,000 |
$1,267
18,181
kWh
|
- | |
| TOTAL RECOMMENDED | $516,088 | $295,415 |
$11,012
157,968
kWh
|
$505,076 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs