Assessment Year | 2005 |
---|---|
Principal Product | Circuit Boards for Gaming Machinery |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
128,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,219 | 803,653 |
kWh
|
$0.065 |
Electricity Demand | $3,148 | 3,364 |
kW-mo/yr
|
$0.94 |
Electricity Fees | $25,764 | - |
|
- |
Natural Gas | $7,995 | 1,047 |
MMBtu
|
$7.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $163,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $289 | $500 |
$280
4,392
kWh
|
$9
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,262 | $5,000 |
$1,222
18,909
kWh
|
$40
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $224 | $750 |
$224
3,450
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,555 | $18,393 |
$2,412
37,156
kWh
|
$143
-
kW-mo/yr
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,951 | $100 |
$8,951
137,757
kWh
|
- | - | |
06 | 4.112: Replace old machine with new automatic multi-station tool | $150,000 | $80,000 | - | - | $150,000 | |
TOTAL RECOMMENDED | $163,281 | $104,743 |
$13,089
201,664
kWh
|
$192
-
kW-mo/yr
|
$150,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs