| Assessment Year | 2005 |
|---|---|
| Principal Product | Circuit Boards for Gaming Machinery |
| NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
| SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
128,000
ft2
|
| Annual Production | 30,000,000
pieces
|
| Production Hrs. Annual | 2,168
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,219 | 803,653 |
kWh
|
$0.065 |
| Electricity Demand | $3,148 | 3,364 |
kW-mo/yr
|
$0.94 |
| Electricity Fees | $25,764 | - |
|
- |
| Natural Gas | $7,995 | 1,047 |
MMBtu
|
$7.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $163,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $289 | $500 |
$280
4,392
kWh
|
$9
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,262 | $5,000 |
$1,222
18,909
kWh
|
$40
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $224 | $750 |
$224
3,450
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,555 | $18,393 |
$2,412
37,156
kWh
|
$143
-
kW-mo/yr
|
- | |
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,951 | $100 |
$8,951
137,757
kWh
|
- | - | |
| 06 | 4.112: Replace old machine with new automatic multi-station tool | $150,000 | $80,000 | - | - | $150,000 | |
| TOTAL RECOMMENDED | $163,281 | $104,743 |
$13,089
201,664
kWh
|
$192
-
kW-mo/yr
|
$150,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||