ITAC Assessment: AS0384
ITAC logo
ITAC Assessment: AS0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Lawn Trimmers
NAICS 333112: Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $100
M
to 500
M
# of Employees 560
Plant Area 506,551
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,712
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $549,826 8,152,435
kWh
Electricity Demand $45,863 18,653
kW-mo/yr
Electricity Fees $53,401 -
Natural Gas $48,138 5,423
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 4.131: Modify process to reduce material use/cost $58,500 $1,130 - - $58,500
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,877 $495 $34,877
1,003,080
kWh
- -
03 4.131: Modify process to reduce material use/cost $26,000 $22,316 - - $26,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,206 $88,805 $5,369
140,315
kWh
$7,837
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,859 $180 $10,251
294,826
kWh
$5,608
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,696 $3,600 $2,389
68,714
kWh
$1,307
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,575 $20 $1,407
39,377
kWh
$1,168
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $904 $961 $560
16,096
kWh
$344
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $902 $251 $583
16,798
kWh
$319
-
kW-mo/yr
-
TOTAL RECOMMENDED $156,519 $117,758 $55,436
1,579,206
kWh
$16,583
-
kW-mo/yr
$84,500
TOTAL IMPLEMENTED $45,336 $22,767 $12,241
351,001
kWh
$7,095
-
kW-mo/yr
$26,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs