Assessment Year | 2004 |
---|---|
Principal Product | Aircraft Parts and Auxiliary Equipment |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
34,100
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 4,042
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,123 | 1,152,319 |
kWh
|
$0.083 |
Electricity Demand | $7,821 | 4,831 |
kW-mo/yr
|
$1.62 |
Electricity Fees | $6,581 | - |
|
- |
Natural Gas | $19,385 | 2,378 |
MMBtu
|
$8.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,917 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,472 | $11,485 |
$2,319
32,036
kWh
|
$4,153
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $880 | $900 |
$880
12,150
kWh
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $7,797 | $26,415 |
$6,847
94,583
kWh
|
$950
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $468 | $737 |
$468
6,466
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $168 | $60 |
$139
1,923
kWh
|
$29
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,132 | $30 |
$937
12,943
kWh
|
$195
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $16,917 | $39,627 |
$11,590
160,101
kWh
|
$5,327
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $1,768 | $827 |
$1,544
21,332
kWh
|
$224
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs