Assessment Year | 2004 |
---|---|
Principal Product | Aerospace Cores |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 360 |
Plant Area |
296,825
ft2
|
Annual Production | 14,400
pieces
|
Production Hrs. Annual | 6,144
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $630,863 | 16,631,772 |
kWh
|
$0.038 |
Electricity Demand | $313,247 | 35,677 |
kW-mo/yr
|
$8.78 |
Electricity Fees | $80,647 | - |
|
- |
Natural Gas | $893,941 | 320,567 |
MMBtu
|
$2.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,075 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $106 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,347 | $28,928 |
$37,893
621,196
kWh
|
$14,454
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,968 | $19,698 |
$4,579
75,060
kWh
|
$1,932
-
kW-mo/yr
|
- | $457 | |
03 | 2.7135: Install occupancy sensors | $4,226 | $4,125 |
$4,226
69,280
kWh
|
- | - | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,555 | $7,700 |
$1,118
18,338
kWh
|
$437
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,873 | $1,872 |
$1,435
23,514
kWh
|
$438
-
kW-mo/yr
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $106 | $51 | - | - |
$106
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $67,075 | $62,374 |
$49,251
807,388
kWh
|
$17,261
-
kW-mo/yr
|
$106
-
MMBtu
|
$457 | ||
TOTAL IMPLEMENTED | $106 | $51 | - | - |
$106
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs