| Assessment Year | 2004 |
|---|---|
| Principal Product | Aerospace Cores |
| NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 360 |
| Plant Area |
296,825
ft2
|
| Annual Production | 14,400
pieces
|
| Production Hrs. Annual | 6,144
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $630,863 | 16,631,772 |
kWh
|
$0.038 |
| Electricity Demand | $313,247 | 35,677 |
kW-mo/yr
|
$8.78 |
| Electricity Fees | $80,647 | - |
|
- |
| Natural Gas | $893,941 | 320,567 |
MMBtu
|
$2.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,075 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $106 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,347 | $28,928 |
$37,893
621,196
kWh
|
$14,454
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,968 | $19,698 |
$4,579
75,060
kWh
|
$1,932
-
kW-mo/yr
|
- | $457 | |
| 03 | 2.7135: Install occupancy sensors | $4,226 | $4,125 |
$4,226
69,280
kWh
|
- | - | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,555 | $7,700 |
$1,118
18,338
kWh
|
$437
-
kW-mo/yr
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,873 | $1,872 |
$1,435
23,514
kWh
|
$438
-
kW-mo/yr
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $106 | $51 | - | - |
$106
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $67,075 | $62,374 |
$49,251
807,388
kWh
|
$17,261
-
kW-mo/yr
|
$106
-
MMBtu
|
$457 | ||
| TOTAL IMPLEMENTED | $106 | $51 | - | - |
$106
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs