ITAC Assessment: AS0374
ITAC logo
ITAC Assessment: AS0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aerospace Cores
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area 296,825
ft2
Annual Production 14,400
pieces
Production Hrs. Annual 6,144
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $630,863 16,631,772
kWh
Electricity Demand $313,247 35,677
kW-mo/yr
Electricity Fees $80,647 -
Natural Gas $893,941 320,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,347 $28,928 $37,893
621,196
kWh
$14,454
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,968 $19,698 $4,579
75,060
kWh
$1,932
-
kW-mo/yr
- $457
03 2.7135: Install occupancy sensors $4,226 $4,125 $4,226
69,280
kWh
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $1,555 $7,700 $1,118
18,338
kWh
$437
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $1,873 $1,872 $1,435
23,514
kWh
$438
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $106 $51 - - $106
-
MMBtu
-
TOTAL RECOMMENDED $67,075 $62,374 $49,251
807,388
kWh
$17,261
-
kW-mo/yr
$106
-
MMBtu
$457
TOTAL IMPLEMENTED $106 $51 - - $106
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs