ITAC Assessment: AS0372
ITAC logo
ITAC Assessment: AS0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Raw Milk
NAICS 112120: Dairy Cattle and Milk Production
SIC 241: Logging
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 1,000,000
ft2
Annual Production 84,862,500
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,980 4,657,360
kWh
Electricity Demand $125,837 14,139
kW-mo/yr
Electricity Fees $3,564 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $209,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,874

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.4133: Use most efficient type of electric motors $996 $691 $609
15,120
kWh
$387
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $198 $120 $144
3,572
kWh
$54
-
kW-mo/yr
-
03 2.9112: Use solar heat to heat water $868 $1,530 - - $868
-
MMBtu
04 2.1331: Burn a less expensive grade of fuel $170,924 $52,200 $128,340
3,184,617
kWh
$41,269
-
kW-mo/yr
$1,315
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,394 $17,193 $10,135
251,486
kWh
$3,259
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $260 $(-220.0) $165
5,124
kWh
$95
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,480 $10,717 $19,552
423,213
kWh
$2,928
-
kW-mo/yr
-
TOTAL RECOMMENDED $209,120 $82,231 $158,945
3,883,132
kWh
$47,992
-
kW-mo/yr
$2,183
-
MMBtu
TOTAL IMPLEMENTED $35,874 $27,910 $29,687
674,699
kWh
$6,187
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs