ITAC Assessment: AS0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 720
Plant Area 275,000
ft2
Annual Production 208,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,149,844 18,970,166
kWh
Electricity Fees $9,223 -
Natural Gas $9,223 952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,289 $150 $12,448
365,071
kWh
$7,841
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,258 $39,378 $9,490
229,481
kWh
$4,768
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,336 $12,650 $9,413
276,035
kWh
$5,923
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $10,545 $16,000 $4,614
118,562
kWh
$5,931
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $2,794 $1,844 $2,327
45,194
kWh
$467
-
kW-mo/yr
06 2.4323: Use optimum size and capacity equipment $1,372 $5,500 $1,203
21,715
kWh
$169
-
kW-mo/yr
TOTAL RECOMMENDED $64,594 $75,522 $39,495
1,056,058
kWh
$25,099
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs