ITAC Assessment: AS0368
ITAC logo
ITAC Assessment: AS0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wire Mesh Products
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 1,224,000
pieces
Production Hrs. Annual 4,182
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,665 2,729,460
kWh
Electricity Demand $17,891 1,112
kW-mo/yr
Electricity Fees $16,494 -
Natural Gas $105,011 13,344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
01 2.3312: Install efficient rectifiers $79,520 $51,660 $69,615
1,506,810
kWh
$9,905
-
kW-mo/yr
- - -
02 4.453: Reschedule breaks to allow for continuous production $66,870 $4,565 - - - $10,413 $56,457
03 2.7232: Replace existing hvac unit with high efficiency model $7,943 $52,000 $5,120
110,823
kWh
$2,823
-
kW-mo/yr
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $4,650 $2,800 $3,798
82,218
kWh
$852
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $3,789 $5,720 - - $3,789
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,743 $15 $1,631
35,309
kWh
$112
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,286 $7,980 $895
19,382
kWh
$391
-
kW-mo/yr
- - -
08 2.4133: Use most efficient type of electric motors $192 $199 $150
3,327
kWh
$42
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $165,993 $124,939 $81,209
1,757,869
kWh
$14,125
-
kW-mo/yr
$3,789
-
MMBtu
$10,413 $56,457
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs