ITAC Assessment: AS0363
ITAC logo
ITAC Assessment: AS0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wallboard, Plaster
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 600,000
ft2
Annual Production 218,124
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,976,152 31,300,918
kWh
Electricity Demand $169,642 72,871
kW-mo/yr
Electricity Fees $535,231 -
Natural Gas $9,390,449 2,475,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,075,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7145: Install skylights $552 $22,526 $552
195,216
kWh
- -
02 2.4133: Use most efficient type of electric motors $265 $2,353 $141
18,757
kWh
$124
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,751 $10,939 $900
52,201
kWh
$851
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $6,720 $750 $6,720
6,026
kWh
- -
05 2.7232: Replace existing hvac unit with high efficiency model $17,401 $10,050 $16,801
141,391
kWh
$600
-
kW-mo/yr
-
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,049,273 $2,100,000 $1,555,500
25,500,000
kWh
$255,367
-
kW-mo/yr
$(-761,594.0)
-
MMBtu
TOTAL RECOMMENDED $1,075,962 $2,146,618 $1,580,614
25,913,591
kWh
$256,942
-
kW-mo/yr
$(-761,594.0)
-
MMBtu
TOTAL IMPLEMENTED $6,985 $3,103 $6,861
24,783
kWh
$124
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs