ITAC Assessment: AS0361
ITAC logo
ITAC Assessment: AS0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Laundry for Uniforms and Work Clothing
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2326: Men's and Boys' Work Clothing
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 30,000
ft2
Annual Production 7,150,000
lb
Production Hrs. Annual 3,654
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,967 594,120
kWh
Electricity Demand $1,267 2,816
kW-mo/yr
Electricity Fees $18,242 -
Natural Gas $84,938 15,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
01 2.2136: Install / repair insulation on steam lines $168 $350 - - $168
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $30 $1,009
13,121
kWh
$16
-
kW-mo/yr
- - -
03 2.7232: Replace existing hvac unit with high efficiency model $1,305 $1,400 $1,287
16,741
kWh
$18
-
kW-mo/yr
- - -
04 2.2444: Use hot process fluids to preheat incoming process fluids $11,899 $17,550 $11,664
151,699
kWh
$235
-
kW-mo/yr
- - -
05 4.514: Re-arrange equipment layout to reduce handling costs $2,290 $482 - - - $2,290 -
06 4.111: Add equipment/ operators to reduce production bottleneck $2,846 $1,000 - - - - $2,846
TOTAL RECOMMENDED $19,533 $20,812 $13,960
181,561
kWh
$269
-
kW-mo/yr
$168
-
MMBtu
$2,290 $2,846
TOTAL IMPLEMENTED $3,483 $862 $1,009
13,121
kWh
$16
-
kW-mo/yr
$168
-
MMBtu
$2,290 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs