| Assessment Year | 2003 |
|---|---|
| Principal Product | Chemicals |
| NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
167,000
ft2
|
| Annual Production | 20,000
Tgal
|
| Production Hrs. Annual | 2,069
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $723,372 | 15,400,467 |
kWh
|
$0.047 |
| Electricity Demand | $60,333 | 72,382 |
kW-mo/yr
|
$0.83 |
| Electricity Fees | $58,705 | - |
|
- |
| Natural Gas | $137,892 | 17,117 |
MMBtu
|
$8.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,021 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,776 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,726 | $10,607 |
$1,544
31,097
kWh
|
$182
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $344 | $1,350 |
$344
9,126
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,496 | $30 |
$986
19,250
kWh
|
$1,510
-
kW-mo/yr
|
- | |
| 04 | 2.3212: Optimize plant power factor | $10,463 | $18,810 | n/a | - | - | $10,463 |
| 05 | 2.6218: Turn off equipment when not in use | $2,253 | $150 |
$2,253
44,008
kWh
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $301 | $616 |
$152
2,969
kWh
|
$149
-
kW-mo/yr
|
- | |
| 07 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $2,438 | $8,705 |
$1,789
34,952
kWh
|
$649
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $20,021 | $40,268 |
$7,068
141,402
kWh
|
$2,490
-
kW-mo/yr
|
$10,463 | ||
| TOTAL IMPLEMENTED | $6,776 | $11,403 |
$4,935
97,324
kWh
|
$1,841
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs