ITAC Assessment: AS0360
ITAC logo
ITAC Assessment: AS0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 167,000
ft2
Annual Production 20,000
Tgal
Production Hrs. Annual 2,069
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $723,372 15,400,467
kWh
Electricity Demand $60,333 72,382
kW-mo/yr
Electricity Fees $58,705 -
Natural Gas $137,892 17,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,726 $10,607 $1,544
31,097
kWh
$182
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $344 $1,350 $344
9,126
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,496 $30 $986
19,250
kWh
$1,510
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $10,463 $18,810 n/a - - $10,463
05 2.6218: Turn off equipment when not in use $2,253 $150 $2,253
44,008
kWh
- -
06 2.4133: Use most efficient type of electric motors $301 $616 $152
2,969
kWh
$149
-
kW-mo/yr
-
07 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers $2,438 $8,705 $1,789
34,952
kWh
$649
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,021 $40,268 $7,068
141,402
kWh
$2,490
-
kW-mo/yr
$10,463
TOTAL IMPLEMENTED $6,776 $11,403 $4,935
97,324
kWh
$1,841
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs